MLD/ZLD mass balance & lifecycle cost modeler
Model a preliminary brine concentration train in under a minute: stage-by-stage recovery and reject TDS, energy and power draw, wetted metallurgy, and a Class 5 CAPEX/OPEX range.
Basis of Design Sheet: preliminary brine train (Class 5)
Recommended process train
Energy & annual operating cost
Recommended wetted metallurgy
| Stage | Est. temperature | Recommended alloy | Why |
|---|
Screening only. Full criteria in the metallurgy & Cl-SCC matrix.
Versus current disposal
Preliminary Class 5 estimate from published ranges, assuming full salt rejection and the stage energy factors on the methodology page. Validate with an ion-chromatography report and treatability testing before budgeting.
How the mass balance works
Dissolved solids are conserved through each stage: concentrate flow = inlet flow × inlet TDS ÷ outlet TDS. Each stage stops at its ceiling: 70,000 mg/L for RO, 135,000 for OARO, 245,000 for MVR, and a 90% solids cake in the crystallizer.
Energy basis
RO 3.8 and OARO 13.0 kWh/m³ of permeate; MVR 52 and crystallizer 78 kWh/m³ evaporated; +15% for high-silica and FGD streams. Electricity is multiplied by your rate and operating days.
Cost basis
CAPEX follows a power-law curve calibrated to published ZLD ranges ($250k–$2M at 1–20 GPM, $5M–$25M at 50–300 GPM, $25M–$50M+ above 1,000 GPM). Full formulas on the methodology page.
Send us the stream before you buy the skid.
Share flow, TDS and a lab ion report. We return a preliminary mass balance, a train recommendation and the questions a vendor bid has to answer.