Engineering tool

MLD/ZLD mass balance & lifecycle cost modeler

Model a preliminary brine concentration train in under a minute: stage-by-stage recovery and reject TDS, energy and power draw, wetted metallurgy, and a Class 5 CAPEX/OPEX range.

Flow unit
GPM
= 136 m³/day
mg/L
$/kWh
$/m³
≈ $0.030/gal
$/metric t
Defaults to $350/t for FGD / heavy metals.
days
Overall water recovery–
Blended SEC–kWh per m³ feed
Continuous power–
Class 5 CAPEX range–AACE Class 5 (−30% / +50%)
Annual OPEX–
Levelized operating cost–

Recommended process train

Energy & annual operating cost

Recommended wetted metallurgy

StageEst. temperatureRecommended alloyWhy

Screening only. Full criteria in the metallurgy & Cl-SCC matrix.

Versus current disposal

Current disposal of full feed–per year
Net operating savings–per year
Simple payback (mid CAPEX)–years
Request engineer review of this train

Preliminary Class 5 estimate from published ranges, assuming full salt rejection and the stage energy factors on the methodology page. Validate with an ion-chromatography report and treatability testing before budgeting.

How the mass balance works

Dissolved solids are conserved through each stage: concentrate flow = inlet flow × inlet TDS ÷ outlet TDS. Each stage stops at its ceiling: 70,000 mg/L for RO, 135,000 for OARO, 245,000 for MVR, and a 90% solids cake in the crystallizer.

Energy basis

RO 3.8 and OARO 13.0 kWh/m³ of permeate; MVR 52 and crystallizer 78 kWh/m³ evaporated; +15% for high-silica and FGD streams. Electricity is multiplied by your rate and operating days.

Cost basis

CAPEX follows a power-law curve calibrated to published ZLD ranges ($250k–$2M at 1–20 GPM, $5M–$25M at 50–300 GPM, $25M–$50M+ above 1,000 GPM). Full formulas on the methodology page.

Send us the stream before you buy the skid.

Share flow, TDS and a lab ion report. We return a preliminary mass balance, a train recommendation and the questions a vendor bid has to answer.