Definitions
Minimum liquid discharge (MLD) recovers 85–98% of the water, usually with membranes and sometimes a brine concentrator, and sends a small, concentrated liquid stream to an existing outlet: a brine line, a deep injection well, a small evaporation pond or hauling. Zero liquid discharge (ZLD) recovers effectively all water and leaves only solids, which means a crystallizer or dryer at the end of the train.
Why the last 5–10% costs the most
Recovery and concentration are linked by mass balance: if salt is conserved, residual TDS equals feed TDS divided by (1 − recovery). Each additional point of recovery near the end multiplies concentration, pushes the train from membranes into evaporators, and raises the energy per cubic meter by roughly ten times. In practice the final 5–10% of water accounts for 40–60% of total ZLD energy and capital.
| Overall recovery | Residual brine (per 100 m³ feed at 10,000 mg/L) | Residual TDS | Typical last stage |
|---|---|---|---|
| 75% | 25 m³ | 40,000 mg/L | Brackish RO |
| 90% | 10 m³ | 100,000 mg/L | HPRO / OARO |
| 95% | 5 m³ | 200,000 mg/L | OARO multi-stage or MVR |
| 98% | 2 m³ | ~saturation | MVR brine concentrator |
| 100% | 0 m³ (solid cake) | Dry salt | Crystallizer / ATFD |
Assumes complete salt rejection to the concentrate. Real permeate carries some TDS, so residual volumes are slightly larger.
Site conditions that favor MLD
- Access to a dedicated brine line (for example the SAWPA Inland Empire Brine Line in Southern California) with capacity available.
- An existing or permittable UIC Class I or Class II injection well, typically $0.50–$3.00/m³ piped.
- Enough land and net evaporation for a small lined pond once the volume has been cut by 90%+.
- A disposal contract that accepts concentrated brine at a price per gallon lower than the marginal ZLD cost.
Conditions that force ZLD
- A permit with zero-discharge limits, such as FGD wastewater under EPA 40 CFR 423.
- RCRA hazardous brine where hauling costs $2–$10+/gal and carries cradle-to-grave liability.
- No outlet at all: no sewer acceptance, no brine line, no well, no land.
- A salt product with value (sodium sulfate, lithium, calcium chloride) that justifies crystallization.
Cost framing
Compare the marginal ZLD stage, not the whole plant: price the crystallizer, its energy (60–110+ kWh/m³ evaporated), its metallurgy and salt cake landfill (non-hazardous $47.50–$72/ton typical; hazardous $250–$600+/ton) against the cost of the residual liquid at your MLD outlet. The modeler lets you switch the endpoint between MLD and full ZLD and watch the energy and cost bars move.
Hybrid answers
Many sites end up in between: MLD now, with the brine concentrator sized and laid out so a crystallizer can be added if a permit tightens. Leaving space, steam/power capacity and a crystallizer tie-in costs little compared with retrofitting.